Call 336-829-5016
Home/Products/Excavator/Excavator Ripper
EA-RIPPERExcavator Ripper manufactured by East AttachmentsExcavator

Machine-specific attachment

Excavator Ripper

A high-strength single-point excavator ripper for breaking hard ground, roots, frost, and compacted material.

MACHINE RANGE1.5–70 ton excavators
APPROX. LEAD TIME10–15 working days
MODELEA-RIPPER

Lead time begins only after all required measurements are confirmed.

No measurements needed to get started. Tell us your machine and attachment needs; we’ll help confirm fitment and prepare your quote.

Watch the ripper demonstration ↓

Ripper
Demonstration Video

See the East Attachments sawtooth ripper working through ground and roots in the field.

IS THIS THE RIGHT ATTACHMENT?

Practical uses

Breaking hard or compacted ground and working roots before material removal.

Standard or sawtooth ripper?

The standard option focuses work at a single point. The sawtooth double-serrated option adds working edges along the profile. Compare the ground and root conditions with the shop before selecting.

Tell us about the job

Describe the ground, roots and intended follow-up work; machine size alone does not establish performance.

Start with your machine make and model. Final dimensions and application suitability are reviewed before fabrication.

BUILT AROUND
THE APPLICATION.

  • Standard ripper
  • Sawtooth double-serrated ripper
  • Black or yellow paint

WHAT WE
CONFIRM.

Machine make and model, coupler type, pin diameter in millimeters, and required pin-on measurements when applicable.

Pins are not included and are sold separately.

Final fitment, pricing, freight, and the lead-time start date are confirmed by the East Attachments team before steel is cut.

Getting to know your excavator →View illustrated guide sheets →

BEFORE YOU
ORDER.

Can I use a ripper instead of a digging bucket for the whole job?

A ripper concentrates force to loosen difficult ground or work roots; it does not carry loose spoil like a bucket. Plan how you will remove the loosened material and include the ground conditions in your inquiry. Hard rock, frost and root structures vary, so the intended application needs review rather than a blanket performance promise.

What information is needed to quote the Excavator Ripper?

Start with your machine make/model and a way to contact you. Measurements are not required for the initial inquiry. Before fabrication, we confirm: Machine make and model, coupler type, pin diameter in millimeters, and required pin-on measurements when applicable.

When would the Excavator Ripper be ready?

The approximate build lead time is 10–15 working days, starting after all required measurements are confirmed. Current shop volume and the selected configuration can affect timing. Freight transit is additional; share your needed-on-site date when requesting a quote.

What mounting hardware is included with the Excavator Ripper?

Pins are not included and are sold separately.

What affects the quoted price and delivery cost?

Size, mounting requirements and selected options affect attachment pricing. For freight, provide the delivery ZIP code, whether the address is a business, farm or residence, and your unloading equipment. Freight depends on shipment size, weight and delivery access; confirm the attachment, selected options and delivery charges in the quote before ordering.

Can I request a modification that is not listed?

Yes. Every configuration includes a place to describe additional modifications. East Attachments will review feasibility, fitment, pricing, and lead time before fabrication.

NEED A MACHINE-SPECIFIC BUILD?

LET’S BUILD IT.

REQUEST A QUOTE →
EAST ATTACHMENTS

SEARCH THE SITE

Leave a Review