EAST ATTACHMENTSCall 336-829-5016
Home/Products/Excavator/Excavator Ripper
EA-RIPPERExcavator Ripper manufactured by East AttachmentsExcavator

Machine-specific attachment

Excavator Ripper

A high-strength single-point excavator ripper for breaking hard ground, roots, frost, and compacted material.

MACHINE RANGE1.5–70 ton excavators
APPROX. LEAD TIME10–15 working days
MODELEA-RIPPER

Lead time begins only after all required measurements are confirmed.

BUILT AROUND
THE APPLICATION.

  • Standard ripper
  • Sawtooth double-serrated ripper
  • Black or yellow paint

WHAT WE
CONFIRM.

Machine make and model, coupler type, pin diameter in millimeters, and required pin-on measurements when applicable.

Pins are not included and are sold separately.

Final fitment, pricing, freight, and the lead-time start date are confirmed by the East Attachments team before steel is cut.

BEFORE THE
BUILD STARTS.

What information is needed to quote a Excavator Ripper?

Machine make and model, coupler type, pin diameter in millimeters, and required pin-on measurements when applicable.

How long does a Excavator Ripper take to build?

The approximate lead time is 10–15 working days. Lead time is calculated after East Attachments confirms all required measurements and can vary with current shop volume.

Are pins included with the Excavator Ripper?

Pins are not included and are sold separately.

Can I request a modification that is not listed?

Yes. Every configuration includes a place to describe additional modifications. East Attachments will review feasibility, fitment, pricing, and lead time before fabrication.

NEED A MACHINE-SPECIFIC BUILD?

LET'S BUILD IT.

START CONFIGURATION →