Maryland DNR describes forest cover as around 40% of the state's land area, highlighting the importance of connected forest habitat.
Source: Maryland Department of Natural Resources ↗
2026 WinnerSteel ProductsCALL NOW336-829-5016Maryland · Attachment guide
POPULAR ATTACHMENTS
FOR MD WORK.
Maryland's stormwater projects and forested properties make precise earth shaping and selective material separation useful priorities. These recommendations address planned drainage work and clearing tasks while keeping the site's design requirements central.
Controlled shaping around water and working land.
Recommendations are based on publicly documented state conditions and major work sectors, then matched to the intended functions of East Attachments products. They do not represent audited statewide sales rankings or guarantee suitability for every job.
The Maryland Stormwater Design Manual includes guidance for environmental site design, bioretention, filters and open channels—applications where excavation profile and finishing control matter.
Source: Maryland Department of the Environment ↗PRIMARY
RECOMMENDATIONS.
These three products align most closely with recurring applications supported by the state evidence above. Open any attachment to review fitment, options and lead time.

Ditching Bucket
Wide, shallow geometry suits planned swale shaping, ditch cleanup and loose-material finishing.
View product →
Tilting Bucket
Angle adjustment supports controlled slopes and contours when following a drainage or grading design.
View product →
Excavator Rake
Separates brush and roots from loose soil on approved selective-clearing projects.
View product →BEFORE YOU
INQUIRE.
- Provide the specified swale cross-section, slope and finish requirements.
- Confirm carrier hydraulics and clearance before choosing a tilting bucket.
- Follow the project's approved limits of disturbance; attachment selection does not authorize clearing or waterway work.
- Always provide machine make and model, coupler type and required pin-on measurements.